Petaling Jaya · Klang Valley · 24/7 emergency ยท Office Mon–Sat 8:00–19:00 ☎ +60 11-2748-3621  ·  [email protected]
HomeCapabilities › Bathroom Rebuild

Bathroom rebuilds you don’t have to babysit

Strip-out to handover under one project lead. You get one quote, one schedule, one warranty — not three subcontractors blaming each other when the floor weeps two weeks later.

What a Hydroline rebuild includes

  • Demolition and protected debris removal (lift mats, corridor sheeting, building-management notification).
  • Soil-pipe and supply-line inspection and any necessary re-routing.
  • Two-coat cementitious waterproofing with 24-hour ponding test.
  • Floor screed with calculated fall to drain, tested with marble-rolling before tile.
  • Tile layout in 3D before we cut anything.
  • Fixture installation (you supply or we source).
  • Silicone finishing, mirror & accessory mounting, final clean.
  • Three-day live-test before sign-off.

What we deliberately don’t do

We don’t move structural walls, we don’t alter electrical circuits ourselves (we bring a Suruhanjaya Tenaga-licensed electrician), and we don’t fit gas heaters without an Energy Commission gas contractor. Everyone we bring is named on the contract.

Newly renovated bathroom
Indicative timelines

How long the rebuild takes

Small ensuite

2.5 to 4 m², fixtures only. Typically 7–9 working days including waterproofing cure.

Family bathroom

5 to 7 m², full re-tile, double vanity. 12–16 working days.

Combined wet area

Bathroom + laundry yard, partition changes. 18–24 working days.

Cost bands and per-square-metre rates are covered during the site survey — we won’t quote bathrooms blind.